Description
The 6″ Imperial top take-off is installed on a main central furnace trunk duct and is to be connected to a secondary round branch. The take-off is used when the connections must be placed between the joists .to bring ventilation in each room of the building.
Technical specifications
Finishย :Galvanized
Componentย :Steel
Diameterย :6″
Typeย :Rectangular to Round
Utilizationย :Transition Between a Rectangular and a Round Duct
Gaugeย :30



Reviews
There are no reviews yet.